Earthworks to remove vegetation, grass and top soil allowing for the construction of the new footpath.

Construction of a new footpath 1.5 metres wide, 125 mm thick fibre reinforced concrete.

Minor drainage works at the intersection with Back Lane.

As part of these works, new concrete may be placed through landowner’s driveways. Access to their properties will be restricted for a four-day period following from when the concrete is poured. This is required to allow the concrete to set properly before any vehicles can use the driveway. Our contractor will advise you, in advance, of any works affecting access to their properties.

Appropriate traffic and pedestrian control measures will be implemented onsite during these works. This will be a construction zone and we appreciate that for your own safety and others that access will be restricted. Our staff and contractor will notify nearby residents, businesses and user groups who may be impacted by these works. We appreciate that these works may present an inconvenience and we ask for your patience during these times. Our contractor will make every effort to minimise disruptions to motorists, school, residents and businesses.

The use of heavy plant and machinery including noisy and vibration works for construction including saw cutting, use of trucks for removal or delivery of materials