Bass Coast Shire has appointed contractors Wiltrack Earthmoving to carry out kerb renewal works on Corsair Grove in Inverloch.

These works are being carried out under Council annual supply contract as a part of Council’s adopted 2021-22 Capital Works Program.

The renewal of this section of Corsair Grove ensures that Council's road network is sustainable and be able to continue to provide appropriate levels of service for road users well into the future.

This project is being funded by $100,000 from the State Government’s Roads to Recovery Program as well $75,000 from Council.

  • Removal and installation of about 370 metres of barrier kerb and agi lines on the both sides of the road, including some laybacks into driveways.
  • Reconstruction of road pavement one metre in front of the existing kerb and channel, including asphalt surfacing.
  • As part of these works, new concrete may be placed through landowner’s driveways. Access to properties will be restricted for a four-day period following from when the concrete kerb is poured. This is required to allow the concrete to set properly before any vehicles can use their driveway. Our contractor will advise you, in advance, of any works affecting access to their properties.
  • Appropriate traffic and pedestrian control measures will be implemented onsite during these works. This will be a construction zone and we appreciate that for your own safety and others that access will be restricted. Our staff and contractor will notify nearby residents who may be impacted by these works.

The use of heavy plant and machinery including noisy and vibration works for construction including saw cutting, use of trucks for removal or delivery of materials