Project Summary

Bass Coast Shire Council's Infrastructure Delivery department will shortly commence works on the 2024/25 Urban and Rural Spray Sealing Programs. Details of the project are outlined below.

Thank you for your patience during the construction period. Please do not hesitate to contact us if you have any questions prior to or during the project.

About the Project:

  • The road resealing program ensures the spray seal provides a new waterproof barrier, preventing failures in the pavement. The new seal also provides a more skid resistant surface, resulting in safer roads. This proactive maintenance program ensures our road network retains its quality and extends the life of the existing road pavement, providing long term cost savings.
  • Preparation works including kerb and pit renewal, asphalt block patching and minor patching.
  • Spray sealing of listed roads.
  • Street sweeping 2 to 4 weeks post sealing to allow aggregate time to bed.

This program is funded by Bass Coast Shire Council at a cost of $390,000.

  • Our contractors will advise each property via letter drop with FAQ sheet, in advance (generally within 2 days) of any works outside their property and will complete their works under traffic control with minimal delays and restrictions.
  • To minimise disruptions and allow the successful completion of the work, landowners will also be notified that their motor vehicles are not parked on the road.
  • Access to properties will be maintained, although some short delays may occur.
  • Noise from plant and machinery, including rollers, bitumen spraying equipment and use of trucks delivery of materials to site.
  • Appropriate traffic and pedestrian control measures will be implemented during these works. No road closures are expected.
  • Council acknowledges that it can be a challenge to deliver the necessary works and not affect road users, especially when much of the work is determined by weather conditions. It is expected that there will be some delays to traffic during the works period. Contractors will take all necessary steps to minimise delays to road users.

Locations

The table below lists the streets to be improved for the urban and rural spray sealing works:

Road Name

Location

Woolamai Beach Road

Cape Woolamai

Coghlan Road

Cowes

Seaview Street

Newhaven

Berrys Beach Road

Ventnor

Stewarts Road

Kongwak

Kernot Krowera Road

Kernot

Hill Street

Kilcunda

Bent Street

Wonthaggi

Dunn Street

Wonthaggi

Fuller Road

Wonthaggi

Reed Crescent

Wonthaggi

Hagelthorn Street

Wonthaggi

Murray Street

Wonthaggi

Gordon Avenue

Inverloch

Darling Avenue

Inverloch

Florida Avenue

Inverloch

Inverloch Parade

Inverloch

Williams Street service road

Inverloch

Wonthaggi Road service road

Inverloch