Project Summary

Bass Coast Shire Council’s Infrastructure Services Department will shortly commence the construction of final capping at Wonthaggi Closed Landfill at 180 Cameron Street, Wonthaggi, in accordance with the EPA approved Technical Specification, associated construction drawings and Construction Quality Assurance Plan.

About the Project:

This project will include construction of final capping in layers – intermediate, subsoil and topsoil/mulch with the installation of an infiltration drainage system, cuspated sheet geo-composite drain and stormwater infrastructures.

We appreciate your patience during the construction period, and please do not hesitate to reach out to us if you have any questions before or during the project.

The works include:

  • Construction of final capping in layers – intermediate, subsoil and topsoil/mulch with the installation of an infiltration drainage system, cuspated sheet geo-composite drain and stormwater infrastructures.

This project is funded by Bass Coast Shire Council with a total cost of $7,200,000.

  • Construction of final capping in layers – intermediate, subsoil and topsoil/mulch.
  • Installation of infiltration drainage system, cuspated sheet geo-composite drain and stormwater infrastructures.
  • More activities around the existing Wonthaggi Transfer Station.
  • Appropriate traffic and pedestrian control measures will be implemented onsite with all required signages.
  • The use of heavy plant, noisy machinery and vibration works for construction including use of trucks for removal and delivery of materials.
  • Increased trucks traffic in Cameron Street with proper traffic management.

Map of Works