Project Summary
Bass Coast Shire Council’s Infrastructure Delivery department completed renewal works in November 2024 on the footpath between 137-157 Thompson Ave, Cowes.
- Demolition and removal of existing concrete footpath between 137-157 Thompson Avenue, Cowes.
- 1.5 metre pedestrian footpaths between 137-157 Thompson Avenue, Cowes.
- Earthworks and reinstatement.
This project is funded by Bass Coast Shire Council at a cost of $60,000.
- Some existing concrete driveways will be replaced with plain reinforced concrete at no cost to the property owner. The reason for replacement of some driveways is to allow the correct cross fall and to match new levels for the path.
- Access to the businesses will be limited during the duration of works. The contractor will work directly with the local businesses to minimise the impact.
- Parking bays in the work area will be affected.
- Access to your property will be restricted for a four-day period following from when the concrete is poured. This is required to allow the concrete to set properly before any vehicles can use the driveway. Our contractor will advise you, in advance, of any works affecting access to your properties.
- Appropriate traffic and pedestrian control measures will be in place throughout the duration of works, including reduced speed limits.